    246 condos covered★70 districts mapped★Real prices · noise · neighbourhood intel★Independent · no agents★Built by expats, for expats★No sponsored listings. Ever.★246 condos covered★70 districts mapped★Real prices · noise · neighbourhood intel★Independent · no agents★Built by expats, for expats★No sponsored listings. Ever.★

    Noise Map

    Active construction sites in Singapore and their estimated noise impact zones. Data sourced from URA development applications.

    Low
    Medium
    High
    Very High
    Leaflet © OpenStreetMap contributors
    Click a marker for details.

    Tuas Mega Port – Phase 1 Berths

    Largest port project in Singapore. Ongoing reclamation, quay wall construction, and yard infrastructure.

    100 dBA · Very High
    Industrial / Port
    ~1000m

    CRL Phase 1 – Ang Mo Kio Station

    Interchange station works beneath Ang Mo Kio Ave 3. Heavy civil and tunnelling works.

    98 dBA · Very High
    MRT / Infrastructure
    ~700m

    Tuas Mega Port – Phase 2 (Reclamation)

    Active land reclamation using sand and clay fill. Dredging and bund construction.

    98 dBA · Very High
    Industrial / Port
    ~1000m

    CRL Phase 1 – Teck Ghee Station

    Deep underground station construction with pile driving and concourse excavation.

    95 dBA · Very High
    MRT / Infrastructure
    ~600m

    CRL Phase 1 – Maju Station (Brickland)

    Bored tunnelling and station box excavation through residential area.

    95 dBA · Very High
    MRT / Infrastructure
    ~600m

    CRL Phase 1 – King Albert Park Station

    Cut-and-cover and bored tunnel construction. MRT station box excavation and structural works.

    95 dBA · Very High
    MRT / Infrastructure
    ~600m

    North-South Corridor (NSC) – Central Section

    Expressway tunnel and above-ground carriageway construction. Major civil works along CTE alignment.

    92 dBA · Very High
    MRT / Infrastructure
    ~700m

    CRL Phase 1 – Buona Vista Interchange

    CRL-Circle Line interchange tunnel boring and platform construction.

    92 dBA · Very High
    MRT / Infrastructure
    ~550m

    TEL Phase 5 – Founders' Memorial Station

    Underground station excavation near Marina Bay waterfront. Diaphragm wall works.

    92 dBA · Very High
    MRT / Infrastructure
    ~600m

    TEL Phase 5 – Gardens by the Bay Station

    Bored tunnelling and station excavation. Major underground works in progress.

    92 dBA · Very High
    MRT / Infrastructure
    ~600m

    Tengah New Town – Forest Hill District

    Large-scale HDB housing development. Simultaneous piling, superstructure, and infrastructure works across multiple blocks.

    90 dBA · Very High
    HDB / Township
    ~800m

    Jurong Region Line – Tengah Station

    Elevated MRT viaduct construction and station platform works in Tengah New Town.

    90 dBA · Very High
    MRT / Infrastructure
    ~550m

    North-South Corridor – Woodlands Section

    Elevated expressway and managed lanes construction. Piling and viaduct works.

    88 dBA · High
    MRT / Infrastructure
    ~600m

    Jurong Region Line – Choa Chu Kang West Station

    Elevated station and viaduct erection. Pile driving and formwork.

    88 dBA · High
    MRT / Infrastructure
    ~500m

    Tengah New Town – Garden District

    HDB BTO flats under construction. Crane operations and concrete works.

    85 dBA · High
    HDB / Township
    ~600m

    Jurong Region Line – Peng Kang Hill Station

    At-grade and elevated guideway construction with noise barriers.

    85 dBA · High
    MRT / Infrastructure
    ~450m

    Jurong Region Line – Nanyang Gateway Station

    Viaduct construction adjoining NTU campus. Crane and formwork operations.

    85 dBA · High
    MRT / Infrastructure
    ~500m

    Tengah New Town – Park District

    Residential blocks and town centre construction. Major earthworks phase.

    82 dBA · High
    HDB / Township
    ~600m

    Kallang Alive – Bayshore HDB

    New BTO development near East Coast Park. Piling and substructure works.

    80 dBA · High
    HDB / Township
    ~450m

    Marina Gardens Lane GLS (Marina South)

    New private residential development on Marina South GLS site. Piling and podium works.

    80 dBA · High
    Residential
    ~400m

    Mount Pleasant (Former Police Academy) Redevelopment

    Major mixed-use development. Demolition complete; new construction underway.

    80 dBA · High
    HDB / Township
    ~500m

    Hillhaven EC (Hillview Rise)

    Executive condominium. Structural works in progress.

    78 dBA · High
    Residential
    ~350m

    Orchard Boulevard Condo (GLS)

    High-rise residential tower construction in prime Orchard district.

    75 dBA · Medium
    Residential
    ~300m

    Lentor Modern (Lentor Hills Road)

    Private mixed-use development. Superstructure construction nearing completion.

    75 dBA · Medium
    Residential
    ~300m

    Punggol Digital District – Phase 2

    Business park campus development. Superstructure and M&E fit-out in progress.

    72 dBA · Medium
    Commercial / Mixed
    ~400m